[time-nuts] 10811 foam enclosure
Bob Camp
lists at rtty.us
Mon Jan 10 12:59:42 UTC 2011
Hi
The spec they were after was a warmup to "on frequency +/- 1x10^-8" from -40 C sort of thing. I believe the warmup time was under 15 minutes, but I don't know the exact number.
Bob
On Jan 9, 2011, at 8:43 PM, Mike S wrote:
> At 06:36 PM 1/9/2011, Tom Van Baak wrote...
>> The outer oven was a hack so Z3801A could meet telecom cell tower cold weather warm-up specs. In other words, the better performance they were looking for in that case was warm-up time; not a tempco or frequency stability spec.
>
> The Nortel GPSR (Z3801A) had a very loose warm up spec, which wouldn't have required a double oven by itself: "The GPSR will be permitted a 24 hour warm-up/training period in the event of a power loss and the 24 hour holdover requirement shall be met following this training period."
>
> The other basic requirement was "+/-1 us traceable to and synchronous with Universal Coordinated Time (UTC) with at least one satellite in view." Again, a double oven wouldn't be required for that - the GPS receive itself should do better.
>
> OTOH, it had a spec of +/- 7 us for a 24 hour holdover, which required a double oven.
>
> _______________________________________________
> time-nuts mailing list -- time-nuts at febo.com
> To unsubscribe, go to https://www.febo.com/cgi-bin/mailman/listinfo/time-nuts
> and follow the instructions there.
More information about the time-nuts
mailing list