[time-nuts] Line Frequency standard change - Possible ?

Thomas D. Erb tde at electrictime.com
Thu Feb 9 15:40:20 EST 2017

I was wondering if anyone was familiar with this proposal, is this a uncoupling of line frequency from a time standard ?

The purpose of proposed Reliability Standard PRC-012-2 is to ensure that remedial action schemes do not introduce unintentional or  unacceptable reliability risks to the bulk electric system.


Thomas D. Erb
tde at electrictime.com<mailto:tde at electrictime.com> /
Electric Time Company, Inc.
Office: 508-359-4396 x 117 / Fax: 508-359-4482
97 West Street Medfield, MA 02052 USA

More information about the time-nuts mailing list