[time-nuts] Fwd: TNS-BUF High Isolation, Low Noise Buffer Amp Available

John Ackermann N8UR jra at febo.com
Wed Oct 19 19:15:17 EDT 2016


We've received enough orders to go ahead with production on the TNS-BUF, 
so here's your last chance to join the cool kids -- we'll take orders at 
http://tapr.org/kits_tns-buf through tomorrow, Oct. 20.

John
-------- Forwarded Message --------
Subject: [time-nuts] TNS-BUF High Isolation, Low Noise Buffer Amp Available
Date: Wed, 5 Oct 2016 10:15:46 -0400

I've previously mentioned a high performance buffer amplifier called the
"TNS-BUF" that I built based on a design by Dr. Bruce Griffiths with
further input from John Miles. Key numbers are:

*  Phase noise -140dBc/Hz at 1 Hertz offset, noise floor -175dBc/Hz.
     (PN plot attached)
*  Reverse isolation greater than 100dB; low enough that I can't make a
     trustworthy measurement.
*  Gain from -10 to +7 dB from 1 to 30 MHz; maximum output >18dBm.
*  Nominal 18VDC operation, but works down to 12V with lowered
     maximum output level.

There's information, including performance data and schematic, at
http://www.febo.com/pages/TNS-BUF

There seems to be some interest in an amplifier like this, so TAPR has
decided to do a limited production run.  The amp is built with surface
mount parts, so we thought an assembled and tested board was better than
a kit.  The price will be $119 each.  But we have no idea how much
interest there is, and we need to build a minimum of 25 units to make
production feasible.

So, here's the deal:  you can order your TNS-BUF at

http://tapr.org/kits_tns-buf

through *October 20*.  If we receive orders for at least 25 boards by
then, we will charge credit cards and place the production order with
our contract manufacturer.  If we don't get 25 orders, we'll cancel the
project and credit cards will not be charged.  There's no guarantee that
boards will be available for later order.

We expect about 60 days between placing the manufacturing order and
receipt of the boards at TAPR.  We'll ship to customers ASAP after
receipt.  So that means you can expect to receive your order shortly
after January 1.

So, go to http://tapr.org/kits_tns-buf now to place your order before
the deadline!

John




-------------- next part --------------
A non-text attachment was scrubbed...
Name: tns-buf-rev_b-4hour_config-b_pn.png
Type: image/png
Size: 105063 bytes
Desc: not available
URL: <http://www.febo.com/pipermail/time-nuts/attachments/20161019/31fd6b98/attachment-0001.png>
-------------- next part --------------
_______________________________________________
time-nuts mailing list -- time-nuts at febo.com
To unsubscribe, go to https://www.febo.com/cgi-bin/mailman/listinfo/time-nuts
and follow the instructions there.


More information about the time-nuts mailing list